Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19CL0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19CL0029","CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL AT NAYUM RIVER CONTROL STA. 0+100  - STA. 0+338.5, STA. CRUZ, ZAMBALES","Flood Control and Drainage","Completed",14185484.95,0,100,"Zambales 1st DEO","Region III","JOYNIELTIN CONSTRUCTION AND TRADING (41858)","2019-09-23","2019-12-07",2019,"Regular Infra - GAA 2019 OO-2",15.81029,119.91843,"105520000","105500000"]
SHA-256
07fed82fa78ef35d5ee603a82a3ad06b7b841ad5d27df9437f8df023353d247f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.