Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DD0095

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DD0095","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/ RESTORATION OF SLOPE PROTECTION/REVETMENT AT SABANG BR., LIPA CITY, BATANGAS","Flood Control and Drainage","Completed",9506000,0,100,"Batangas 4th DEO","Region IV-A","JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)","2019-06-04","2019-12-19",2019,"Regular Infra - GAA 2019 OO-2",13.94286,121.16668,"401014000","401000000"]
SHA-256
fdf9558a10282bfc560d6e5c77692c22b08855f69eea988d9b26c401a7184e10

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.