Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DD0121

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DD0121","LOCAL PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS- CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION/REHABILITATION OF DRAINAGE SYSTEM AT BARANGAY MABINI, LIPA CITY, BATANG","Flood Control and Drainage","Completed",9505020,0,100,"Batangas 4th DEO","Region IV-A","PRECIOUS CONSTRUCTION (32995)","2019-07-09","2019-10-06",2019,"Regular Infra - GAA 2019 LP",13.89865,121.14834,"401014000","401000000"]
SHA-256
a56b6221f514927949a8f3ba223bd6bcceb8d8ceb225bf566514a56e28fc8c27

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.