Project 19DD0512
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DD0512","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG SAN JUAN-LAIYA ROAD, HUGOM SECTION,","Flood Control and Drainage","Completed",41649809,0,100,"Batangas 4th DEO","Region IV-A","JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)","2019-11-05","2020-10-24",2019,"Regular Infra - GAA 2019 OO-2",13.66444,121.37389,"401023000","401000000"]
SHA-256
ae0cb2dba73f51c972537b9b1b7d526d9476346cd9ddfd8a51ef9873d5fa9b38Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.