Project 19DD0536
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DD0536","CONSTRUCTION OF ROAD AND SLOPE PROTECTION ALONG LAIYA- MALABRIGO ROAD, SITIO NATUNGKAD TO SITIO BIGA, HUGOM SECTION, SAN JUAN, BATANGAS","Roads","Completed",52041250,0,100,"Batangas 4th DEO","Region IV-A","JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)","2020-10-09","2021-05-06",2019,"Outside Infra - Contingent Fund 2019 Extended",13.66196,121.36715,"401023000","401000000"]
SHA-256
480aa464b91db62c4f7a1a3852fbac2509f1e30b7f12691a6567b42bc44cd762Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.