Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DI0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DI0010","CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF RIVER CONTROL ALONG MAITIM WATERWAYS, BAY, LAGUNA","Flood Control and Drainage","Completed",39190234.92,0,100,"Laguna 2nd DEO","Region IV-A","BHENLLABIEN BUILDERS CORPORATION (FORMERLY: BHENLLABIEN BUILDERS CONSTRUCTION) (36496)","2019-07-03","2020-02-03",2019,"Regular Infra - GAA 2019 OO-2",14.17753,121.27446,"403402000","403400000"]
SHA-256
cd78e82213d7cafdb746be29eb1241105237e88e8c0cb2548886fdb40cf0df19

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.