Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DI0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DI0012","CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF RIVER CONTROL ALONG SLEX STA. ROSA RIVER, BRGY. MAMPLASAN, BIÑAN CITY, LAGUNA","Flood Control and Drainage","Completed",46354832.3,0,100,"Laguna 2nd DEO","Region IV-A","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2019-07-15","2020-02-29",2019,"Regular Infra - GAA 2019 OO-2",14.29091,121.0903,"403428000","403400000"]
SHA-256
8e35ee3310e0b9853293f7419fd4922d3aa37d54a1650fe13d9ad573f939ea2b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.