Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DM0073

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DM0073","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG HINGUIN RIVER, PADRE BURGOS, QUEZON","Flood Control and Drainage","Completed",9800000,0,100,"Quezon 3rd DEO","Region IV-A","WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) (34778)","2019-07-15","2019-09-03",2019,"Regular Infra - GAA 2019 LP",13.94771,121.82735,"405629000","405600000"]
SHA-256
f307cfe7830413f95f1e1fd4e5fe369d3c3ed3d7fb42e0fc230fd3b30aae178a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.