Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DN0144

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DN0144","CONSTRUCTION OF ROAD & DRAINAGE SYSTEM, BRGY. SAN ISIDRO, CAINTA, RIZAL","Roads","Completed",7586282.17,0,100,"Rizal 1st DEO","Region IV-A","HONY TRADING & CONSTRUCTION (26898)","2019-07-16","2019-11-12",2019,"Regular Infra - GAA 2019 LP",14.62906,121.10841,"405805000","405800000"]
SHA-256
6480ab767cab44856f4d7b03a023c9aab3f0a109c493803c345252ce03aca832

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.