Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DN0176

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DN0176","CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF CREEK (MC ADAM SO. IBAYO PHASE 2), BRGY. MAYAMOT, ANTIPOLO CITY","Flood Control and Drainage","Completed",18716076.33,0,100,"Rizal 1st DEO","Region IV-A","BELL CONSTRUCTION (27851)","2019-08-20","2020-03-16",2019,"Regular Infra - GAA 2019 OO-2",14.48226,121.18828,"405804000","405800000"]
SHA-256
e2dc58c041dd9c6d31ef224bdd34979a45d4830486b0686bd918fbf4bf77f631

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.