Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DO0025

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DO0025","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- REHABILITATION OF FLOOD CONTROL ALONG PILILLA RIVER E. TIBAY-ALCANTARA ST., BRGY. WAWA TO LAGUNA DE BAY, PILILLA, RIZAL","Flood Control and Drainage","Completed",33357125.89,0,100,"Rizal 2nd DEO","Region IV-A","A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL (22265)","2019-06-26","2019-12-05",2019,"Regular Infra - GAA 2019 OO-2",14.47509,121.30871,"405810000","405800000"]
SHA-256
6605db2ad9cae4947a05ed57977d7fdf4d51dad080a1a0bafe7094d4f43b97ea

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.