Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19DQ0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19DQ0051","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/  MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION/ REVETMENT/ RIPRAPPING AND OTHER IMP","Flood Control and Drainage","Completed",96499856.48,0,100,"Region IV-A","Region IV-A","GRAIA CONSTRUCTION CORPORATION (30826)","2019-07-25","2020-08-17",2019,"Regular Infra - GAA 2019 OO-2",14.42779,120.9787,"402103000","402100000"]
SHA-256
eae713531df837d91a830801d59739cb9d23a40412d7abdd8153df821bfb1127

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.