Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19EF0135

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19EF0135","CONSTRUCTION OF ABO-ABO FLOOD CONTROL, BARANGAY ABO-ABO, SOFRONIO ESPAÑOLA, PALAWAN","GAA 2019 LP","Completed",4890088.3,0,100,"Palawan 2nd DEO","MIMAROPA Region","PALBIC CONSTRUCTION AND SUPPLY (42744)","2019-10-04","2020-02-25",2019,"Regular Infra - GAA 2019 LP",9.15638,118.11357,"1705324000","1705300000"]
SHA-256
6fd53057bffdf19ccf5d8e76485889fc0eca2fc4a226ae01299c375076a75d66

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.