Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19EH0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19EH0008","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF AGUTAY FLOOD CONTROL STRUCTURE   STA. 00 + 369.50 - STA. 00 + 575.47 (B/S), MAGDIWANG, ROMBLON","GAA 2019 OO-2","Completed",27640410.2,0,100,"Romblon DEO","MIMAROPA Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2019-06-24","2020-02-19",2019,"Regular Infra - GAA 2019 OO-2",12.45968,122.44406,"1705908000","1705900000"]
SHA-256
b918e09b6df855bdd48871c098e021e0e03cd6e520a11ff72efeb195390737ff

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.