Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19EH0025

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19EH0025","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF TABOBO-AN RIVER CONTROL,   STA. 00 + 018 - STA. 00 + 376.80 (L/S) (AS PER SURVEY), TABOBO - AN, ODIONGAN, ROMBLON","GAA 2019 OO-2","Completed",38360096.22,0,100,"Romblon DEO","MIMAROPA Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2019-06-24","2020-02-10",2019,"Regular Infra - GAA 2019 OO-2",12.37913,121.98429,"1705909000","1705900000"]
SHA-256
4b0e671f6b1ddb67cf2d736ce522691bfc3e1313f7805f3ce18c2a9081c7491c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.