Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FA0024

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FA0024","CLUSTER 4-CONSTRUCTION/MAINTENANCE/REHABILITATION/EXTENSION OF FLOOD MITIGATION STRUCTURES AND SEAWALL AT TIWI, MALILIPOT AND TABACO CITY, ALBAY","Flood Control and Drainage","Completed",92671740,0,100,"Albay 1st DEO","Region V","MAKAPA CORPORATION (30029)","2019-06-07","2019-12-30",2019,"Regular Infra - GAA 2019 OO-2",13.48133,123.6515,"500518000","500500000"]
SHA-256
54ac93cba3f86da606b365e808c1d8be7aebf3e738fae7768abffb82b6813a08

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.