Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FB0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FB0020","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF COTMON-HOYOP-HOYOPAN FLOOD CONTROL SYSTEM, CAMALIG, ALBAY","Flood Control and Drainage","Completed",19050811.75,0,100,"Albay 2nd DEO","Region V","NUMERICAL GATE CONSTRUCTION & SUPPLY CORPORATION (34122)","2019-05-23","2019-09-27",2019,"Regular Infra - GAA 2019 OO-2",13.12151,123.6585,"500502000","500500000"]
SHA-256
992ec24da856a7e3b994067833022adda92c08cf17cc68afdf536fa18fa147c8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.