Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FB0154

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FB0154","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL SYSTEM, CABANGAN, CAMALIG, ALBAY","Flood Control and Drainage","Completed",9497990.32,0,100,"Albay 2nd DEO","Region V","FIXTRUCTURE CONSTRUCTION & SUPPLY (43767)","2019-07-10","2019-10-11",2019,"Regular Infra - GAA 2019 OO-2",13.19787,123.67765,"500502000","500500000"]
SHA-256
1e4b3755836d7c2e68e65c8d32f1ac1c35e47884a7f0fb625dc0d5c2e9f313fb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.