Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FB0228

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FB0228","CONSTRUCTION OF BOGTONG CAUSEWAY (PHASE 2), BRGY. BOGTONG, RAPU-RAPU, ALBAY","Roads","On-Going",88823818.34,0,100,"Albay 2nd DEO","Region V","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2019-10-16",null,2019,"Regular Infra - GAA 2019 LP",13.21617,124.02193,"500515000","500500000"]
SHA-256
2a3c8f1962bbe1044beada4c3d9b4cfaa52d426f7db5c605e13ef2f4a6ca4d54

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.