Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FD0060

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FD0060","OO2:CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF DIKE, BICOL RIVER BASIN, BRGY. SAN JOSE, MINALABAC, CAMARINES SUR","Flood Control and Drainage","Completed",29398068.52,0,100,"Camarines Sur 2nd DEO","Region V","BICOL GOLDROCK CONSTRUCTION CORPORATION (32376)","2019-06-17","2020-01-31",2019,"Regular Infra - GAA 2019 OO-2",13.49646,123.21791,"501722000","501700000"]
SHA-256
90d95f26f5717f5fa67e736bb4aa5f854ac8276184f408eb29903bd511135024

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.