Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FF0092

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FF0092","CONSTRUCTION/IMPROVEMENT/REPAIR OF FLOOD CONTROL STRUCTURE ALONG BALANGAO RIVER, P00322872LSECTION 1 ; STA.0+000.00 - STA.0+218.00 (RIGHT SIDE)SECTION 2 : STA.0+200.00 - STA.0+218.00 (LEFT SIDE)TIGAON, CAMARINES SUR","Flood Control and Drainage","Completed",27918240,0,100,"Camarines Sur 4th DEO","Region V","PARTIDO CONSTRUCTION & SUPPLY (20631)","2019-08-05","2020-06-14",2019,"Regular Infra - GAA 2019 OO-2",13.58063,123.4475,"501725000","501700000"]
SHA-256
ccdf01ca176af5e29da46e4d678e40899769dd90c0c033d59fd902324a2d2a7e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.