Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FH0090

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FH0090","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG PAJO RIVER, STO. DOMINGO-PAJO SAN ISIDRO, VIRAC, CATANDUANES","GAA 2019 OO-2","Completed",39110385.06,0,100,"Catanduanes DEO","Region V","AL-JON CONSTRUCTION DEVELOPMENT, INC. (FORMERLY: ALJON CONSTRUCTION & SUPPLY) (34481) / ROLCO CONSTRUCTION & DEVELOPMENT CORPORATION ( FOR (29686)","2019-07-15","2020-09-01",2019,"Regular Infra - GAA 2019 OO-2",13.58996,124.18539,"502011000","502000000"]
SHA-256
ad78a56da90b5875c566e10367dd83d8967c954316becdeb48c0bf1ad38b60b9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.