Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FI0024

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FI0024","CONSTRUCTION OF CONCRETE ROAD- CONCRETING OF ROAD, JCT. NATIONAL ROAD- BRGY. LOOC ROAD, MANDAON, MASBATE, LENGTH= 4.572 LANE KM (2.286 KM)","Roads","Completed",24480004.31,0,100,"Masbate 2nd DEO","Region V","MARABE GENERAL CONSTRUCTION & SUPPLY (40326)","2019-06-27","2019-11-01",2019,"Regular Infra - GAA 2019 LP",12.11424,123.24902,"504110000","504100000"]
SHA-256
b86fb9a9d1a9b0c02145362acc7e1762c258ecff0a53eb0705235409d6542f81

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.