Project 19FI0033
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FI0033","CONSTRUCTION OF CONCRETE ROAD-BALUD-PALANI-PANUBIGAN-PAJO-TALISAY ROAD LEADING TO PALANI BEACHES, PANUBIGAN PAJO AND TALISAY MANGROVE AREA, BRGY. TALISAY, BALUD, MASBATE, NET LENGTH = 2.50 LANE KM (1.025 KM)","Roads","Completed",46549138.41,0,100,"Masbate 2nd DEO","Region V","RUBYLIM CONSTRUCTION & SUPPLIES, INC. (FORMERLY: RUBY LIM CONSTRUCTION & SUPPLIES) (11685)","2019-08-28","2020-01-28",2019,"Regular Infra - GAA 2019 CSSP",12.06147,123.20702,"504103000","504100000"]
SHA-256
812b9416fa3207c9e2cc85ab952b087ce5154149377c15ce350fe56e260a0838Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.