Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FK0033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FK0033","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF POBLACION DRAINAGE SYSTEM, CASIGURAN, SORSOGON","Flood Control and Drainage","Completed",56012212.6,0,100,"Sorsogon DEO","Region V","CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)","2019-07-12","2020-05-21",2019,"Regular Infra - GAA 2019 OO-2",12.87382,124.00907,"506205000","506200000"]
SHA-256
315d0abb9db110b46e398b6c777ab2f3dc6060ecf3d18eff9ee6648462efcd05

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.