Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19FL0060

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19FL0060","CONSTRUCTION OF BRGY. BIGO FLOOD CONTROL STRUCTURE, STA. MAGDALENA, SORSOGON","Flood Control and Drainage","Completed",36836184.21,0,100,"Sorsogon 2nd DEO","Region V","CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. (34105)","2019-08-30","2020-02-24",2019,"Regular Infra - GAA 2019 OO-2",12.62945,124.09422,"506215000","506200000"]
SHA-256
4e9be4cb7d08de12267427d5a4b0d75266415b1a27b90db3cd9da6e4729281a1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.