Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19G00069

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19G00069","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG SIPALAY RIVER, SIPALAY CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",96500000,0,100,"Region VI","Region VI","SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2019-06-26","2020-05-10",2019,"Regular Infra - GAA 2019 OO-2",9.76059,122.42866,"1804527000","1804500000"]
SHA-256
6d05ac443ade46570c4f4d39cdf9b714d1d15b0e651b472d16bbd9912c1dec0e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.