Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19GH0066

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19GH0066","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - RECONSTRUCTION OF SEAWALL, BRGY. POBLACION, CARLES, ILOILO","Flood Control and Drainage","Completed",23643114.11,0,100,"Iloilo 3rd DEO","Region VI","A.C. RIVERO DEVELOPMENT CORPORATION (5122)","2019-06-17","2019-12-29",2019,"Regular Infra - GAA 2019 OO-2",11.57164,123.1313,"603014000","603000000"]
SHA-256
9dc659a123b37160d99f2d047d54bb39262dc3052baabc32a24d9d46f1fdade3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.