Project 19GK0081
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19GK0081","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATAGOY CREEK (UPSTREAM), BRGY. RIZAL, SILAY CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",29399561.92,0,100,"Negros Occidental 1st DEO","Negros Island Region","SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2019-06-17","2019-12-26",2019,"Regular Infra - GAA 2019 OO-2",10.79936,122.97973,"1804526000","1804500000"]
SHA-256
416ac6e2a72663737f2882dfce0c6d67e9a40cc826a45c215137cc5248bce30aHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.