Project 19GK0154
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19GK0154","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOGO RIVER (BOTH STREAM) ,ABUT. 'B' VICTORIAS CITY, NEGROS OCCIDENTAL","GAA 2019 OO-2","Completed",93996904.09,0,100,"Negros Occidental 1st DEO","Negros Island Region","REDSON CONSTRUCTION AND SUPPLIES, INC. (FORMERLY: REDSON CONSTRUCTION AND SUPPLIES) (35128) / SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2019-06-27","2020-07-31",2019,"Regular Infra - GAA 2019 OO-2",10.90237,123.04398,"1804531000","1804500000"]
SHA-256
6cc3ce73045d3b58994a638af78617f2f6f584ee7f545b55db4eefc1a57e85a0Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.