Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19GK0155

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19GK0155","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF  HIMOGA-AN RIVER ALONG BACOLOD NORTH ROAD, SAGAY CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",58837568.33,0,100,"Negros Occidental 1st DEO","Negros Island Region","SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2019-06-27","2020-06-06",2019,"Regular Infra - GAA 2019 OO-2",10.88952,123.3541,"1804523000","1804500000"]
SHA-256
1c740412fa52accb93b27fbe413a76c8271e99665d24e556e12b649b3df73500

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.