Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19HA0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19HA0005","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LIBORON FLOOD CONTROL, CALAPE, BOHOL","Flood Control and Drainage","Completed",28510034.71,0,100,"Bohol 1st DEO","Region VII","BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION) (27725)","2019-06-07","2020-01-01",2019,"Regular Infra - GAA 2019 OO-2",9.88037,123.86239,"701210000","701200000"]
SHA-256
e2d92b8d71611e4f17c09248f7653a80570d77638a1b497c32c5eca9996e9238

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.