Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19HA0150

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19HA0150","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF BATERIA RIVER FLOOD CONTROL (SUBA TINAGO), TINANGNAN, TUBIGON, BOHOL","Flood Control and Drainage","Completed",47443187.5,0,100,"Bohol 1st DEO","Region VII","BNYU DEVELOPMENT CORPORATION (FORMERLY:BNYU ENTERPRISES & CONSTRUCTION) (27725)","2019-12-16","2020-07-08",2019,"Regular Infra - GAA 2019 OO-2",9.95161,123.96595,"701245000","701200000"]
SHA-256
414160b997c21a3260278378c28737685cdd208f7ea609ea9ff6b4ea7898300a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.