Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19HB0014

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19HB0014","BRIDGE - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BILAR BRIDGE (B00083BH) ALONG LOAY INTERIOR ROAD, BILAR, BOHOL, K0177+557","Bridges","Completed",7440787.95,0,100,"Bohol 3rd DEO","Region VII","LEDA  CONSTRUCTION INCORPORATED (12229)","2019-06-25","2019-09-07",2019,"Regular Infra - GAA 2019 OO-1",9.71183,124.10751,"701208000","701200000"]
SHA-256
495a7b03c59d02e0c0f6a7f75e8fb842112d025cd46825a368c65576b5c765e0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.