Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19HB0099

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19HB0099","CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION VILLAFLOR CIRCUMFERENTIAL ROAD LEADING TO LOBOC RIVERCRUISE AND FLOATING RESTAURANT, LOBOC TOURISM COMPLEX. BRGY. VILLAFLOR, LOBOC, BOHOL, STA. 0+000.00 - 0+680.00","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP","Completed",12476866.5,0,100,"Bohol 3rd DEO","Region VII","RONNYL CONSTRUCTION (38487)","2019-06-26","2019-09-05",2019,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP",9.63505,124.02971,"701229000","701200000"]
SHA-256
75c317764ba98d0ac2717eaf3270287ad597b7771fc0c478cb22e3ca65e3d0ab

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.