Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19HK0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19HK0021","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-RECONSTRUCTION/REHAB. OF BANICA RIVER CONTROL, BATINGUEL, DUMAGUETE CITY, NEGROS ORIENTAL","Flood Control and Drainage","Completed",34300000,0,100,"Negros Oriental 2nd DEO","Negros Island Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2019-06-27","2020-03-01",2019,"Regular Infra - GAA 2019 OO-2",9.30763,123.28755,"1804610000","1804600000"]
SHA-256
c3bb7f686b9b02e900625d0f84f3146c2a243ccc276cb1e54316831b76e04527

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.