Project 19I00112

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19I00112","CONSTRUCTION OF CADAC-AN FLOOD CONTROL STRUCTURE, CADAC-AN RIVER BASIN, STA. 000+450 - STA. 000+740 (LEFT SIDE RIVER BANK), ABUYOG, LEYTE","GAA 2019 OO-2","Completed",86849955.36,0,100,"Region VIII","Region VIII","EZJONES CONSTRUCTION INC. (34462) / JUCONS CONSTRUCTION OPC (FORMERLY:JUCONS CONSTRUCTION &SUPPLY) (32051)","2019-08-07","2020-09-13",2019,"Regular Infra - GAA 2019 OO-2",10.72001,125.00568,"803701000","803700000"]