Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19I00113

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19I00113","CONSTRUCTION OF MACAHILA FLOOD CONTROL STRUCTURES AND DRAINAGE SYSTEM, MACAHILA RIVER BASIN, STA. 0+350 - STA. 0+680 (RIGHT SIDE RIVER BANK), BAYBAY CITY, LEYTE","Flood Control and Drainage","Completed",74294826.05,0,100,"Region VIII","Region VIII","B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) (9687) / C N E CONSTRUCTION (22148)","2019-08-07","2020-05-18",2019,"Regular Infra - GAA 2019 OO-2",10.82917,124.75968,"803708000","803700000"]
SHA-256
f106586eaac59d5045b2a61f6680afc174ce35f933695d19c0d2b289b8be4f07

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.