Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IA0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IA0041","RECONSTRUCTION OF SANTOL FLOOD CONTROL STRUCTURES ALONG BILIRAN CIRCUMFERENTIAL ROAD, BILIRAN, BILIRAN (124.472105°, 11.479107° - 124.473558°, 11.482370°)","Flood Control and Drainage","Completed",24850000,0,100,"Biliran DEO","Region VIII","YOYEN ENTERPRISES (15541)","2019-06-10","2019-10-14",2019,"Regular Infra - GAA 2019 OO-2",11.49224,124.44929,"807802000","807800000"]
SHA-256
87d48eb32b37e28d0a68dbc6a4a069dc53d0631cdb8c70fa95dc8c87bd7f2eee

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.