Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IB0255

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IB0255","RECONSTRUCTION OF CABAY RIVER FLOOD CONTROL, BRGY. CABAY BALANGKAYAN, EASTERN SAMAR","Flood Control and Drainage","Completed",9413763.07,0,100,"Eastern Samar DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2019-11-21","2020-02-22",2019,"Outside Infra - GAA 2019 NDRRMF",11.44205,125.4848,"802603000","802600000"]
SHA-256
84b06f007d1535d808177329f0e0d6238823dc6c6f3dc2c4174666c7613ac596

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.