Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19ID0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19ID0018","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITH MAJOR  RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF DAGUITAN-MARABONG RIVER FLOOD CONTROL,BRGY. BATUG,DULAG,LEYTE","Flood Control and Drainage","Completed",41467007.11,0,100,"Leyte 2nd DEO","Region VIII","LANOY CONSTRUCTION (35289)","2019-06-07","2019-12-24",2019,"Regular Infra - GAA 2019 OO-2",10.94716,124.97263,"803718000","803700000"]
SHA-256
5ce34bf3ef02ce500b1d1d2ae4c822f8d6d8a8fa40b80265105bbe6ea93d8155

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.