Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IG0001

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IG0001","CONSTRUCTION OF DUNGCA-AN FLOOD CONTROL STRUCTURES AND DRAINAGE SYSTEMS K002+660-K002+960 (RIGHT RIVER BANK), BAYBAY CITY, LEYTE","Flood Control and Drainage","Completed",48402517.74,0,100,"Leyte 5th DEO","Region VIII","RJIR ENTERPRISES CORPORATION (34843)","2019-07-08","2020-03-31",2019,"Regular Infra - GAA 2019 OO-2",10.67934,124.81122,"803708000","803700000"]
SHA-256
e7a8068b65ae613bad529c92bb287ba12d827ee0eb0e0a92428bd3a35c6db703

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.