Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IH0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IH0021","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF SHORE PROTECTION ALONG SAN ANTONIO CIRCUMFERENTIAL RD, SAN ANTONIO, NORTHERN SAMAR","Flood Control and Drainage","Completed",48949384.63,0,100,"Northern Samar 1st DEO","Region VIII","CTC BUILDER AND SUPPLIES INCORPORATED (FOR. CTC BU (12088) / VCD CONSTRUCTION AND SUPPLY (35378)","2019-07-16","2020-03-27",2019,"Regular Infra - GAA 2019 OO-2",12.38002,124.28425,"804817000","804800000"]
SHA-256
c1528d41c91497fec16f899b2a6ece830ae1946ea474ed53358e47f43a88a250

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.