Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IJ0004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IJ0004","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BUGTONG RIVER (DOWNSTREAM), CALBAYOG CITY, SAMAR","Flood Control and Drainage","Completed",43122744.1,0,100,"Samar 1st DEO","Region VIII","PRECIOUS CONSTRUCTION (32995)","2019-07-02","2019-11-21",2019,"Regular Infra - GAA 2019 OO-2",12.25402,124.36932,"806003000","806000000"]
SHA-256
34e9c83b97ed3ac5cc6dcc9f70740c859d91bc6168c179ce12a6d939a3adbd9e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.