Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IJ0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IJ0020","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG JIBATANG RIVER, BRGY. CABUGAWAN, CALBAYOG CITY, SAMAR","Flood Control and Drainage","Completed",29398768.96,0,100,"Samar 1st DEO","Region VIII","JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION) (35890)","2019-06-06","2019-10-23",2019,"Regular Infra - GAA 2019 OO-2",12.14217,124.53496,"806003000","806000000"]
SHA-256
c024e90a830788f8322e902b2549f5a191925f66a798c3528dfce843fa60e10f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.