Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IJ0048

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IJ0048","CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG JIBATANG RIVER (UPSTREAM), BRGY. TARABUCAN, CALBAYOG CITY, SAMAR","Flood Control and Drainage","Completed",41307177.04,0,100,"Samar 1st DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2019-09-16","2020-03-16",2019,"Regular Infra - GAA 2019 OO-2",12.22912,124.58772,"806003000","806000000"]
SHA-256
f0cf740dbb0723e9b7f0976a35ce847056757a04ae60197d12baefb0489cda1c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.