Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19IJ0074

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19IJ0074","002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEM. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BUGTONG RIVER (UPSTREAM),PHASE II, BRGY.BUGTONG CALBAYOG CITY","Flood Control and Drainage","Completed",43662910.85,0,100,"Samar 1st DEO","Region VIII","CDU CONSTRUCTION (13915)","2019-07-04","2019-11-23",2019,"Regular Infra - GAA 2019 OO-2",12.25445,124.37012,"806003000","806000000"]
SHA-256
b99ba5f8a613ed220f32bb09cbccfe04b823614e1b98804c4832c0a55652dedd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.