Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19JD0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19JD0022","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE (REVETMENT/BANK PROTECTION) ALONG DIPOLOG RIVER, DAPDAP BRIDGE ALONG POLANCO-MACLEODES ROAD POLANCO,ZN","Flood Control and Drainage","Completed",38413588.58,0,100,"Zamboanga del Norte 1st DEO","Region IX","GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS) (18052)","2019-05-31","2020-03-17",2019,"Regular Infra - GAA 2019 OO-2",8.5138,123.35842,"907210000","907200000"]
SHA-256
4cb09a1cfac97f38957e0ede5170bfd55dbf4ad5f4e3a3e8578982807ff221da

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.