Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19JG0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19JG0008","REHABILITATION/MAJOR REPAIR OF BRIDGE - SAN PABLO BRIDGE 2 (BO1704MN), ALONG ZAMBOANGA DEL SUR COASTAL ROAD, SAN PABLO, ZAMBOANGA DEL SUR","Bridges","Completed",1903160,0,100,"Zamboanga del Sur 2nd DEO","Region IX","LUCKY SAVER CONSTRUCTION (36152)","2019-06-11","2020-01-27",2019,"Regular Infra - GAA 2019 OO-1",7.65934,123.46134,"907325000","907300000"]
SHA-256
1058a675d1d2450e0c91672b2cfd7efb985cbebb8d4b8f2f522bae9ee079abe1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.