Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 19JI0062

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","19JI0062","REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG SIBUGUEY RIVER, STA. 0+513 TO STA. 1+122 AND STA. 0+000 TO STA 0+088, BARANGAY PILAR, DIPLAHAN, ZAMBOANGA SIBUGAY","Flood Control and Drainage","Completed",77850020,0,100,"Zamboanga Sibugay 1st DEO","Region IX","MINDANAO ROCK (23479)","2019-09-10","2020-06-05",2019,"Regular Infra - GAA 2019 OO-2",7.73643,122.96536,"908303000","908300000"]
SHA-256
6800756f9c005eb3ba8f59c048ac988b351680d2c7a5ea12698879a9dd4400ce

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.